Retail - Restaurants - Entertainment

Fox Racing

Bob Fox, Founder

Kirkwood Plaza

John Kirkorian, President

Kirkwood Plaza

Le Boulanger, Inc.

Dan Brunello, President

Le Boulanger, Inc.

 

Clear Channel

David Williams

Radio Station Engineer

Clear Channel

Melt Ultra Lounge

Melanie and David Krivich, Owners

Melt Ultra Lounge

Specialty's Cafe and Bakery

Allen Arthur, Principal

Arthur Bokman Associates

The experience was entirely positive. All McLarney people we dealt with were knowledgeable, personable and a pleasure to work with. The project itself was completed on-time as specified and with very good workmanship. Communications and coordination of all aspects by Grant Zamudio was positively first-rate. It was very reassuring throughout to know that Grant was on top of things and ready to help resolve any questions or issues. If I was going to do another similar project, I would not hesitate to contact McLarney. 

Bob Fox, Founder

Project

Fox Racing

Related Project:
» Fox Racing

What most impressed my family and I about McLarney Construction was how well they were organized during the construction process at Kirkwood Plaza. Kevin McLarney and his superintendent did a fantastic job of jobsite coordination. Weekly meetings provided us with schedules that were always up-to-date. Our tenants appreciated McLarney's professionalism and the time spent with them explaining the steps required to take place prior to the completion of their premises.

John Kirkorian, President

Kirkwood Plaza

Project
Kirkwood Plaza, Campbell (46,835sf) shell and retail tenant improvement interiors.
Related Project:
» Kirkwood Plaza

McLarney Construction's been a very important asset to us over the last number of years... Our current project has had some unusual challenges due to some lack of design and physical constraints. McLarney had to take on the total redesign of our mechanical system. They were able to bring the resources to the table without losing a step in the process, and redesign the system to meet our specific needs. They basically saved this job.

Dan Brunello, President

Le Boulanger, Inc.

 

Project
LeBoulanger Cafes-Bakeries, Redwood City, Cupertino, Evergreen (15,937sf)
Related Project:
» Le Boulanger, Inc.

McLarney Construction undertook our “workplace priority” not once, but twice and produced fabulous “San Jose” realities for two of our radio station locations. McLarney’s construction process was well-organized and proactive and produced working environments that will continue to enhance the talent and success of our people.  

David Williams

Radio Station Engineer

Clear Channel

Project
Clear Channel, San Jose - Bering Dr. and Clear Channel, San Jose - Koll
Related Project:
»

After we found the perfect home for Melt Ultra Lounge in an 85 year old historic building, McLarney was invaluable in anticipating the challenges we'd face during the preconstruction - construction process. There was an array of negotiations with the city building department and planners, architect, engineers and designers. McLarney successfully maneuvered through everyone's required policies, regulations and timelines to ensure the renovation proceeded with our vision realized. The McLarney team provided the guidance, patience and solutions from project launch to final building approvals.

Melanie and David Krivich, Owners

Melt Ultra Lounge

Project
Melt Ultra Lounge, Palo Alto (5,300sf)
Related Project:
» Melt Ultra Lounge

McLarney Construction transformed an "ugly duckling" building into a restaurant showplace, producing a cafe and bakery that surpassed expectations. McLarney worked through a ton of adversity, city challenges and project deadlines providing timely solutions and successful project results. We really appreciated everything they did.

Allen Arthur, Principal

Arthur Bokman Associates

Project
Specialty's Cafe and Bakery, Santa Clara (5,425sf)
Related Project:
» Specialty's Cafe and Bakery
Please upgrade your Flash Player This is the content that would be shown if the user does not have Flash Player 6.0.65 or higher installed.